Skip to content
July 27, 2026
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

First Review Here

Stop Searching More

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Primary Menu
  • Uttarakhand News
  • Social Media Viral
  • Dehradun
  • Education
  • News
  • World
  • Entertainment
  • Health
  • India
  • Sports
Video
  • Home
  • Uttarakhand News
  • Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon

admin July 27, 2026

A 900-metre tunnel linking the Badrinath and Kedarnath highways has been completed in Rudraprayag, while the Alaknanda bridge is nearing finish. If vehicle trials from August 31 succeed, the new route will ease congestion and streamline the Char Dham Yatra.

A major infrastructure project aimed at improving the Char Dham pilgrimage  route is nearing completion in Uttarakhand’s Rudraprayag district, with a 900-metre-long tunnel connecting the Badrinath and Kedarnath highways now completed.

The project, which links the Rishikesh-Badrinath National Highway with the Kedarnath National Highway, also includes a 200-metre-long double-lane motor bridge over the Alaknanda River. The construction of the bridge has reached its final stage and vehicle trials are expected to begin from August 31.

Officials said that if the trial runs are successful, the third phase of the Char Dham Yatra will be operated through the newly built tunnel and bridge, providing a smoother route for pilgrims and local residents.

The new tunnel and bridge are expected to bring major relief to travellers heading towards Badrinath and Kedarnath. At present, the Badrinath Highway passing through Rudraprayag market is narrow, often leading to long traffic jams. Once the new route becomes operational, pilgrims will be able to bypass the congested market area through the Jawari bypass and directly proceed towards the two pilgrimage sites.

 

The project is expected to reduce travel time, ease traffic congestion, and make the Char Dham Yatra safer and more organised.

Rudraprayag District Magistrate Vishal Mishra said the bridge construction is likely to be completed by August 31. After completion, necessary testing and trial procedures will be carried out to check the bridge’s quality, safety, and technical standards.

 

The District Magistrate said the project is not only aimed at improving traffic movement but is also an important step towards strengthening overall arrangements for the Char Dham Yatra, benefiting thousands of devotees travelling to Badrinath and Kedarnath every year.

Continue Reading

Previous: Dehradun-Mussoorie road shut after cracks appear amid heavy rains
Next: Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House

Related Stories

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House

July 27, 2026
Dehradun-Mussoorie road shut after cracks appear amid heavy rains
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Dehradun-Mussoorie road shut after cracks appear amid heavy rains

July 27, 2026
Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage

July 24, 2026
https://youtu.be/mr6MrumB0_k

Categories

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

Entertainments

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy 1

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy

July 15, 2026
Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters 2

Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters

April 23, 2026
Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today 3

Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today

March 27, 2024
Chief Minister Dhami celebrated Holi with workers, Governor congratulated 4

Chief Minister Dhami celebrated Holi with workers, Governor congratulated

March 26, 2024
Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state 5

Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state

March 23, 2024

You may have missed

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House

July 27, 2026
Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon

July 27, 2026
Dehradun-Mussoorie road shut after cracks appear amid heavy rains
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Dehradun-Mussoorie road shut after cracks appear amid heavy rains

July 27, 2026
Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage

July 24, 2026

Contact Us

Email: Firstreviewhere@gmail.com, Info@firstreviewhere.com
Contact Details: 9410930001
Contact person: 
Neeraj Phondani
Office Address: 
256,191 2nd Block, Chukhuwala, Dehradun

Recent Posts

  • Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun-Mussoorie road shut after cracks appear amid heavy rains

Tags

Business Health Newsbeat Science Sport Stories USA World
  • About Us
  • Contact Us
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Copyright FirstreviewHere© All rights reserved. | MoreNews by AF themes.