Skip to content
June 26, 2026
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

First Review Here

Stop Searching More

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Primary Menu
  • Uttarakhand News
  • Social Media Viral
  • Dehradun
  • Education
  • News
  • World
  • Entertainment
  • Health
  • India
  • Sports
Video
  • Home
  • Uttarakhand News
  • CM Dhami expressed displeasure over the delay in the construction of Rispana and Bindal Corridor, gave strict instructions
  • Dehradun
  • News
  • Uttarakhand News

CM Dhami expressed displeasure over the delay in the construction of Rispana and Bindal Corridor, gave strict instructions

admin February 18, 2025

CM Dhami expressed displeasure over the delay in the construction of Rispana and Bindal Corridor, gave strict instructions
The government has become serious about strengthening the traffic system of the city and getting rid of the problem of jam to the citizens. In this episode, Chief Minister Pushkar Singh Dhami expressed strong displeasure over the delay in the construction of Rispana and Bindal Corridor in the review meeting of Dehradun Elevated Corridor on Monday. Also instructed the officials to start this work soon. He said that a request should also be made to the Central Government to connect the Dehradun Elevated Corridor with the Delhi-Dehradun Expressway. Also, in view of the increasing population and number of vehicles, directed to work on a well-planned plan for other cities. The Chief Minister also expressed displeasure over the delay in the work of Haripur Ghat under construction on the Yamuna river in Kalsi and directed the Mussoorie Dehradun Development Authority to complete this work in six months.

Meeting regarding Dehradun Elevated Corridor
On Monday, Chief Minister Pushkar Singh Dhami held a meeting in the Secretariat regarding the Dehradun Elevated Corridor. He said that after the construction of Delhi-Dehradun Expressway, the number of vehicles and tourists in Dehradun will increase. The number of vehicles is already increasing here. In such a situation, the work of Dehradun Elevated Corridor should be started soon. In this, an 11 km long four-lane elevated corridor is to be constructed on the Rispana River and a 15 km long four-lane elevated corridor on the Bindal River in the Rispana Corridor. For this, the electric line and sewer line from these rivers have to be brought out of the river. Along with the elevated road, construction of retaining wall and flood protection work is also to be done on both sides of the river. The Chief Minister instructed the officials that the results of whatever development work is being done in the state should be visible on the ground. Special attention should be paid to the quality and timeliness of the work. He also asked to start preparations for Nanda Devi Raj Jat from now.

Preparations should be reviewed regularly
The Chief Minister directed Chief Secretary Radha Raturi to regularly review the works of Dehradun Elevated Road, connectivity of Garhwal and Kumaon, Manaskhand Mandir Mala Mission and Nanda Devi Raj Jat. He himself will also review it from time to time. Vice President of State Infrastructure Monitoring Council Vishwas Dabur, Chief Secretary Radha Raturi, Principal Secretary RK Sudhanshu, Principal Chief Forest Conservator Dhananjay Mohan, Secretary Shailesh Bagoli, Nitesh Jha, Dr. Pankaj Kumar Pandey, Dr. R Rajesh Kumar, Ranveer Singh Chauhan, District Magistrate Dehradun Savin Bansal, Vice President MDDA Banshidhar Tiwari, SSP Dehradun Ajay Singh, Municipal Commissioner Namami Bansal and related officers were present in the meeting.

Continue Reading

Previous: Assembly session in Uttarakhand from today, budget estimated at more than one lakh crore rupees, will be presented on 20th
Next: Possibility of rain and snowfall in some places, how will the weather be in the mountains for the next 6 days?

Related Stories

Nagrasu Gurudwara standoff simmers down, precautionary measures in place
  • News
  • Social Media Viral
  • Uttarakhand News

Nagrasu Gurudwara standoff simmers down, precautionary measures in place

June 23, 2026
SIR in U’khand: 18.5 lakh mapped, 8.8 lakh unmapped voters to receive notice
  • News
  • Social Media Viral
  • Uttarakhand News

SIR in U’khand: 18.5 lakh mapped, 8.8 lakh unmapped voters to receive notice

June 23, 2026
Uttarakhand trekker missing for 10 days; drones, 120 rescuers join race to find her
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand trekker missing for 10 days; drones, 120 rescuers join race to find her

June 13, 2026
https://youtu.be/mr6MrumB0_k

Categories

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

Entertainments

Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters 1

Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters

April 23, 2026
Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today 2

Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today

March 27, 2024
Chief Minister Dhami celebrated Holi with workers, Governor congratulated 3

Chief Minister Dhami celebrated Holi with workers, Governor congratulated

March 26, 2024
Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state 4

Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state

March 23, 2024
Famous singer Sonu Nigam reached Uttarakhand, surrounded by fans on seeing him 5

Famous singer Sonu Nigam reached Uttarakhand, surrounded by fans on seeing him

March 8, 2024

You may have missed

Nagrasu Gurudwara standoff simmers down, precautionary measures in place
  • News
  • Social Media Viral
  • Uttarakhand News

Nagrasu Gurudwara standoff simmers down, precautionary measures in place

June 23, 2026
SIR in U’khand: 18.5 lakh mapped, 8.8 lakh unmapped voters to receive notice
  • News
  • Social Media Viral
  • Uttarakhand News

SIR in U’khand: 18.5 lakh mapped, 8.8 lakh unmapped voters to receive notice

June 23, 2026
Uttarakhand trekker missing for 10 days; drones, 120 rescuers join race to find her
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand trekker missing for 10 days; drones, 120 rescuers join race to find her

June 13, 2026
President Murmu to visit Rashtrapati Niketan in Dehradun today
  • News
  • Social Media Viral
  • Uttarakhand News

President Murmu to visit Rashtrapati Niketan in Dehradun today

June 12, 2026

Contact Us

Email: Firstreviewhere@gmail.com, Info@firstreviewhere.com
Contact Details: 9410930001
Contact person: 
Neeraj Phondani
Office Address: 
256,191 2nd Block, Chukhuwala, Dehradun

Recent Posts

  • Nagrasu Gurudwara standoff simmers down, precautionary measures in place
  • SIR in U’khand: 18.5 lakh mapped, 8.8 lakh unmapped voters to receive notice
  • Uttarakhand trekker missing for 10 days; drones, 120 rescuers join race to find her

Tags

Business Health Newsbeat Science Sport Stories USA World
  • About Us
  • Contact Us
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Copyright FirstreviewHere© All rights reserved. | MoreNews by AF themes.