Skip to content
July 27, 2026
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

First Review Here

Stop Searching More

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Primary Menu
  • Uttarakhand News
  • Social Media Viral
  • Dehradun
  • Education
  • News
  • World
  • Entertainment
  • Health
  • India
  • Sports
Video
  • Home
  • Uttarakhand News
  • Arrangements have been made to go from the railway station to Ram temple, devotees will go by e-buses – the fare is only this much rupees.
  • Dehradun
  • News
  • Uttarakhand News

Arrangements have been made to go from the railway station to Ram temple, devotees will go by e-buses – the fare is only this much rupees.

admin January 15, 2024

Now the access of devotees to Ramnagari will become easier. The plan for operating electric city buses has been finalized. After the Chief Minister shows the green flag, the operation of these buses will start from Sunday afternoon. Per person fare on e-buses has also been fixed, which is a minimum of Rs 10. E-buses will be operated on five routes connecting Ramnagari. In the first phase, 10 e-buses will be introduced on each route.

The 23 kilometer long Route-One is from Katra to Saadatganj Rampath. On this route, it will run till Saadatganj via Ayodhyadham, Saket Overbridge, Lata Chowk, Durgaganj, Katra, Durgaganj, Lata Chowk, Shringarhat, Hanumangarhi, Shri Ram Hospital, Tedhi Bazaar, Udaya Square, Amaniganj, Chowk, Nianwa, Rikabganj, Roadways, Kachehri. The 22 kilometer long route-two is from Salarpur to Ayodhya Dham. On this, the e-bus will reach Ayodhya Dham from Saket Over Bridge via Salarpur, Purekashi, Raipur, Polytechnic, Saadatganj, Kachehri, Roadways, Rikabganj, Nianwa, Gudribazar, Sahabganj, Amaniganj, Udaya Square, Tedhibazar, Shri Ram Hospital, Hanumangarhi, Shringarhat, Lata Chowk. The bus will run to the station. The 31 kilometer long Route-3 is from Bharatkund to Railway Station Cantt.

On this e-bus Ayodhya Dham, booth no. Will operate from Char, Mahobra, Devkali, Bhikhapur, Janora, Naka, Fatehganj, Police Line, Railway Station Cantt, Roadways, Kachehri, Saadatganj, Transport Nagar, Rae Bareli Square, Naka Square, Chandpur, Dabhasemar, Masoudha, Purakalandar to Bharatkund. The 33 kilometer long Route-Four will connect Barun Bazar to Ayodhya Cantt. On this, e-bus will stop at Ayodhya Dham, Booth No.4, Mahobra, Devkali, Bhikhapur, Janora, Naka, Fatehganj, Police Line, Railway Station Cantt, Roadways, Kachehri, Saadatganj, Transport Nagar, Rae Bareli Cut, Paigapur, Moushiwala, Prabhatnagar, Sariawa. , will run from Ranibazar, Amouna, Nauvakuan to Barun Bazar. The 36 kilometer long Route-Five will connect Purabazar to Railway Station Cantt. On this, return from Ayodhya Dham, Booth No. 4, Suryakund, Parakhan, Yash Paper Mill, Sarairasi, Rajepur, Purabazar, Rajepur via the same route from Mahobra, Devkali, Bhikhapur, Naka, Rae Bareli, Transport Nagar, Saadatganj, Kachehri, Roadways to Railway Station. Will operate till Cantt.

This will be the per capita fare-
Zero to four km is Rs 10, four to seven km is Rs 15, seven to 10 km is Rs 20, 10 to 13 km is Rs 25, 13 to 16 km is Rs 30, 16 to 20 km is Rs 35, 20 to The per person fare has been fixed at Rs 40 for up to 24 km, Rs 45 for 24 to 30 km, Rs 50 for 30 to 36 km, Rs 55 for 36 to 42 km, Rs 60 for 42 to 48 km, Rs 70 for 48 to 54 km. Has gone.

Continue Reading

Previous: PM-JANMAN: PM Modi will release the first installment to one lakh beneficiaries today, read which people will get the benefits and how.
Next: CM Dhami gave a big gift to the people of Nainital, bus terminal will be built in Kathgodam.

Related Stories

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House

July 27, 2026
Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon

July 27, 2026
Dehradun-Mussoorie road shut after cracks appear amid heavy rains
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Dehradun-Mussoorie road shut after cracks appear amid heavy rains

July 27, 2026
https://youtu.be/mr6MrumB0_k

Categories

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

Entertainments

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy 1

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy

July 15, 2026
Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters 2

Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters

April 23, 2026
Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today 3

Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today

March 27, 2024
Chief Minister Dhami celebrated Holi with workers, Governor congratulated 4

Chief Minister Dhami celebrated Holi with workers, Governor congratulated

March 26, 2024
Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state 5

Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state

March 23, 2024

You may have missed

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House

July 27, 2026
Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon

July 27, 2026
Dehradun-Mussoorie road shut after cracks appear amid heavy rains
  • Dehradun
  • News
  • Social Media Viral
  • Uttarakhand News

Dehradun-Mussoorie road shut after cracks appear amid heavy rains

July 27, 2026
Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Tree Felling For Rishikesh-Bhaniyawala Project Halted Amid Public Outrage

July 24, 2026

Contact Us

Email: Firstreviewhere@gmail.com, Info@firstreviewhere.com
Contact Details: 9410930001
Contact person: 
Neeraj Phondani
Office Address: 
256,191 2nd Block, Chukhuwala, Dehradun

Recent Posts

  • Uttarakhand Nurse, Seeking A Job, Consumes Phenyl Outside Minister’s House
  • Char Dham Yatra boost: 900-metre tunnel to link Badrinath-Kedarnath Highways soon
  • Dehradun-Mussoorie road shut after cracks appear amid heavy rains

Tags

Business Health Newsbeat Science Sport Stories USA World
  • About Us
  • Contact Us
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Copyright FirstreviewHere© All rights reserved. | MoreNews by AF themes.