On Wednesday, Chief Minister Pushkar Singh Dhami inaugurated 14 development schemes costing Rs 5904.68 lakh and laid the foundation stone of two schemes costing Rs 4157.34 lakh in Ramnagar. On this occasion, the Chief Minister announced the shifting of the Corbett Park reception hall to Amdanda in Ramnagar, along with the construction of underground power lines on both sides of the NH road in Ramnagar and the construction of bus stands on the land of the Irrigation Department for private buses in Ramnagar. declare.
Among the schemes inaugurated by Chief Minister Pushkar Singh Dhami, the total cost for wallpainting and culture painting scheme in Ramnagar and Bailpadav is 20.00 lakhs, construction cost of road from Gandhinagar road to Dhaila barrage and crematorium in Ramnagar is 94.23 lakhs, Jitendra’s house in Anandnagar Pipalpadav of Ramnagar. From Junior High School to Mohan Prasad’s house in Gandhinagar Shivpuri Purani Basti, cost of construction work 100.00 lakhs, construction cost of road from Chandranagar Maldhan Choudh to Shamshanghat 220.03 lakhs, from Ompal Choudhary’s house in Maldhan Choudh cost 109.34 lakhs. Construction work cost up to main road 80.15 lakh, construction work cost 48.29 lakh from Bhupalram’s house in Gram Panchayat Gautam Nagar to Chandranagar main road, Ramnagar-Haldwani-Kathgodam-Sitarganj busy motorway surface construction cost 643.75 lakh, Sardar Nagar-Bajpur of Kaladhugi Keshowala-Bailpadav-Kotabag re-construction work cost 2063.03 lakh, work cost for second 60 meter span construction in Tumdiadam 653.72, Ramnagar ring road re-construction work cost 751.14 lakh, Nainital-Kaladhugi-Bajp The work of surface construction of Dur Motorway cost 378.81 lakhs, strengthening and line shifting work of power lines from Nayangao to Dhikuli in Ramnagar-Kaladhugi cost 459.33 lakhs and reconstruction work from Ring Road Hathidangar to Maldhan Dhela in Ramnagar costing 282.86 lakhs.
Along with this, Chief Minister Dhami laid the foundation stone of multi-storey parking construction cost 1300.00 lakh and construction work of inter-state bus terminal in Ramnagar costing 2857.34 lakh on vacant land in Old Tehsil.