Skip to content
July 29, 2026
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

First Review Here

Stop Searching More

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Primary Menu
  • Uttarakhand News
  • Social Media Viral
  • Dehradun
  • Education
  • News
  • World
  • Entertainment
  • Health
  • India
  • Sports
Video
  • Home
  • Uttarakhand News
  • Disaster management structure will be improved in Uttarakhand at a cost of 1480 crores, CM Dhami expressed gratitude to PM Modi
  • Dehradun
  • News
  • Uttarakhand News

Disaster management structure will be improved in Uttarakhand at a cost of 1480 crores, CM Dhami expressed gratitude to PM Modi

admin December 18, 2024

The disaster management structure will now be strengthened in disaster-sensitive Uttarakhand with the World Bank-assisted Uttarakhand Disaster Preparedness and Resilient Project (U-Prepare). For this, the World Bank has approved a loan amount of 1480 crores. 80 percent of the project cost will be borne by the Center and 20 percent by the State Government. Under the project, along with developing disaster-related early warning systems in the state, works like construction of disaster shelters, roads and bridges, effective steps to control forest fires will be done. Chief Minister Pushkar Singh Dhami has expressed gratitude to the Central Government including Prime Minister Narendra Modi for the approval of this project. He said that the project taking shape will help in reducing the impact of the disaster as well as speeding up relief and rescue operations during disasters in the state. With the aim of strengthening disaster management and reducing the response time during disasters, a blueprint for externally aided U-Prepare was drawn in the year 2023. Then in September, it got the green signal from the Cabinet. After this, the proposal of the project was sent to the Center. The loan signing for the project was done on Monday by Union Joint Secretary Alok Tiwari, Uttarakhand Disaster Management Secretary Vinod Kumar Suman and World Bank India Director Auguste Tano Koame. Now this loan amount has been approved.

These will be the main works

Early Warning System: – Disaster management software will be updated to develop a disaster related early warning system. Also, sensors will be installed at various places and rivers. Sirens will also be installed to issue warnings at various places.

Command and Control System: – Under the project, a command and control system will be built in Dehradun, with which all the districts will be connected. The system of disaster control room will also be strengthened at the district level.

Construction of 45 bridges:- 45 such bridges of PWD will be constructed in the project, which are weak or have flaws. Road safety works will be done at eight places.

Also read- In the world of Akharas, the penance of Shri Niranjani’s Jhundi Toli is more difficult than commandos, they take special training to protect religion

10 Disaster shelter homes:- Disaster shelter homes will be built in sensitive areas with a view to taking the affected people to a safe place in the disaster-prone area.

19 fire stations will be strengthened:- Fire stations have also been included in the project. Under this, other steps will be taken including availability of equipment in the selected 19 fire stations.

Training center will be built in Jolly Grant:- Disaster training center will be built in the campus of SDRF established in Jolly Grant.

Prevention of forest fire:- Establishment of crew-stations, arrangement of equipment, purchase of motorcycles or other vehicles will be done under this project to control forest fire and reduce response time.

Continue Reading

Previous: Even if the number of children including twins is three, one can still contest Panchayat elections; Amendment will be made in the Act
Next: Trouble for passengers going to Delhi, operation of super deluxe Volvo buses of Uttarakhand Transport Corporation stopped

Related Stories

Amid mounting pressure, Pradhan quits
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Amid mounting pressure, Pradhan quits

July 28, 2026
Congress leader Hira Singh Bisht no more
  • Dehradun
  • Education
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Congress leader Hira Singh Bisht no more

July 28, 2026
Committed to making Uttarakhand the land of science, technology & innovation: CM
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Committed to making Uttarakhand the land of science, technology & innovation: CM

July 28, 2026
https://youtu.be/mr6MrumB0_k

Categories

Connect with Us

  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram

Entertainments

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy 1

Discover Uttarakhand’s Pahadi Kulthi Dal: A Healthy and Flavorful Delicacy

July 15, 2026
Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters 2

Earth Day 2026 | All That Breathes, I Am Greta And More Documentaries That Spotlight Real-Life Environmental Fighters

April 23, 2026
Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today 3

Jhanda Ji Mela: Faith started rising, quilt stitching in Darbar Sahib from today

March 27, 2024
Chief Minister Dhami celebrated Holi with workers, Governor congratulated 4

Chief Minister Dhami celebrated Holi with workers, Governor congratulated

March 26, 2024
Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state 5

Holi of flowers played at Raj Bhavan, Governor Lieutenant General Gurmeet Singh congratulated the people of the state

March 23, 2024

You may have missed

Amid mounting pressure, Pradhan quits
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Amid mounting pressure, Pradhan quits

July 28, 2026
Poor drainage, waterlogging expose gaps in urban planning
  • Uncategorized

Poor drainage, waterlogging expose gaps in urban planning

July 28, 2026
Congress leader Hira Singh Bisht no more
  • Dehradun
  • Education
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Congress leader Hira Singh Bisht no more

July 28, 2026
Committed to making Uttarakhand the land of science, technology & innovation: CM
  • Dehradun
  • India
  • News
  • Social Media Viral
  • Uttarakhand News

Committed to making Uttarakhand the land of science, technology & innovation: CM

July 28, 2026

Contact Us

Email: Firstreviewhere@gmail.com, Info@firstreviewhere.com
Contact Details: 9410930001
Contact person: 
Neeraj Phondani
Office Address: 
256,191 2nd Block, Chukhuwala, Dehradun

Recent Posts

  • Amid mounting pressure, Pradhan quits
  • Poor drainage, waterlogging expose gaps in urban planning
  • Congress leader Hira Singh Bisht no more

Tags

Business Health Newsbeat Science Sport Stories USA World
  • About Us
  • Contact Us
  • Privacy Policy
  • Disclaimer
  • Terms & Conditions
  • Facebook
  • Twitter
  • Linkedin
  • VK
  • Youtube
  • Instagram
Copyright FirstreviewHere© All rights reserved. | MoreNews by AF themes.